none

碩士 === 國立中央大學 === 工業管理研究所 === 104 === Except to turnover, the cost control is the most important factor to business management. How to reduce labor cost and diminish working time are the important subjects to manual handling-oriented enterprise. This paper is going to study the precise way of wor...

Full description

Bibliographic Details
Main Authors: Chen-Hui Lee, 李真慧
Other Authors: 何應欽
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/05240404923557361770
id ndltd-TW-104NCU05041051
record_format oai_dc
spelling ndltd-TW-104NCU050410512017-06-10T04:46:48Z http://ndltd.ncl.edu.tw/handle/05240404923557361770 none 運用動作分析及工時研究於改善作業員產出-以T晶圓封裝公司之研究對象 Chen-Hui Lee 李真慧 碩士 國立中央大學 工業管理研究所 104 Except to turnover, the cost control is the most important factor to business management. How to reduce labor cost and diminish working time are the important subjects to manual handling-oriented enterprise. This paper is going to study the precise way of working time calculation, furthermore, to find out that there is any room to improve for existing operation hour. This paper is using methods of time measurement to calculate standard working hours to get the following conclusions and recommendations.  Using standard working hours development to set up working hours data base for manufacturing department, they can base on the result to do the headcount arrangement.Reducing the waste of manpower costs while reaching the product delivery schedule.  Classify all working job to make the working hour improvement plan, and than to optimize human resource utilization. 何應欽 2016 學位論文 ; thesis 60 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 工業管理研究所 === 104 === Except to turnover, the cost control is the most important factor to business management. How to reduce labor cost and diminish working time are the important subjects to manual handling-oriented enterprise. This paper is going to study the precise way of working time calculation, furthermore, to find out that there is any room to improve for existing operation hour. This paper is using methods of time measurement to calculate standard working hours to get the following conclusions and recommendations.  Using standard working hours development to set up working hours data base for manufacturing department, they can base on the result to do the headcount arrangement.Reducing the waste of manpower costs while reaching the product delivery schedule.  Classify all working job to make the working hour improvement plan, and than to optimize human resource utilization.
author2 何應欽
author_facet 何應欽
Chen-Hui Lee
李真慧
author Chen-Hui Lee
李真慧
spellingShingle Chen-Hui Lee
李真慧
none
author_sort Chen-Hui Lee
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/05240404923557361770
work_keys_str_mv AT chenhuilee none
AT lǐzhēnhuì none
AT chenhuilee yùnyòngdòngzuòfēnxījígōngshíyánjiūyúgǎishànzuòyèyuánchǎnchūyǐtjīngyuánfēngzhuānggōngsīzhīyánjiūduìxiàng
AT lǐzhēnhuì yùnyòngdòngzuòfēnxījígōngshíyánjiūyúgǎishànzuòyèyuánchǎnchūyǐtjīngyuánfēngzhuānggōngsīzhīyánjiūduìxiàng
_version_ 1718457068178898944