Considering Due Window of the Optimal Producing Assignment of Multi-Plant and Multi-Product – A Case Study of the Machine Tool Parts Manufacturer
碩士 === 國立雲林科技大學 === 工業工程與管理系 === 104 === To satisfy the needs to supply and develop potential possibilities, industries urged to expand their production capacity. While the original plants can’t wait to be expanded, industries would thrive to meet the production capacity via setting up new plants or...
Main Authors: | LIU, WEI-CHEN, 劉韋辰 |
---|---|
Other Authors: | LIN, CHUN-WEI |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/suj6rq |
Similar Items
-
Machines-parts Assignment for Multi-Cells Shop with Machine Pooling
by: Zeng, Jian-Chang, et al.
Published: (2011) -
Multi-Plant and Multi-Stage Manufacturing Process Rush Order Assignment and Evaluation
by: Yueh-E Li, et al. -
Developing a cellular manufacturing model considering the alternative routes, tool assignment, and machine reliability
by: Sayyed Mahdi Sadat Khorasgani, et al.
Published: (2017-10-01) -
Tolerance Allocation and Plant Assignment in a Multi-Plant Manufacturing Environment
by: Feng-Yi Huang, et al.
Published: (2005) -
Multi-Plant and Multi-Stage Manufacturing Process Order Assignment with Capacity and Material Constraints for Coordinated Manufacturing
by: Jin-Tian Lin, et al.
Published: (2004)