Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example
碩士 === 國立雲林科技大學 === 營建工程系 === 104 === Through this study, literature review, high-speed rail station working class team factor questionnaire, Pearson correlation analysis, ANOVA analysis, the first of its kind in the doctoral thesis of Master high-speed rail construction project research team....
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/bb92rb |
id |
ndltd-TW-104YUNT0582008 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104YUNT05820082019-05-15T22:34:18Z http://ndltd.ncl.edu.tw/handle/bb92rb Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example 影響團隊績效因素之實證研究-以X高鐵站為例 Cheng Yu Tsai 蔡承彧 碩士 國立雲林科技大學 營建工程系 104 Through this study, literature review, high-speed rail station working class team factor questionnaire, Pearson correlation analysis, ANOVA analysis, the first of its kind in the doctoral thesis of Master high-speed rail construction project research team. The study found that the major high-speed rail station working class team performance team factors, respectively, team leadership, team incentive bonus, team functions, team conflicts, time pressures. Pearson correlation coefficient analysis, "team incentive bonus" most relevant "performance", "team leader" and "performance" relevant times, "the functions of the team" and "performance" related to the third, "Team Conflict" and "Performance" section four related to "time pressure" and "performance" related to the fifth. ANOVA analysis, three cases of conflict in a team, team incentive bonus, there is no significant difference in the time pressure factor of three teams. Only the team leader, team functions differ two factors. Shu Shun Liu 劉述舜 2016 學位論文 ; thesis 69 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立雲林科技大學 === 營建工程系 === 104 === Through this study, literature review, high-speed rail station working class team factor questionnaire, Pearson correlation analysis, ANOVA analysis, the first of its kind in the doctoral thesis of Master high-speed rail construction project research team.
The study found that the major high-speed rail station working class team performance team factors, respectively, team leadership, team incentive bonus, team functions, team conflicts, time pressures. Pearson correlation coefficient analysis, "team incentive bonus" most relevant "performance", "team leader" and "performance" relevant times, "the functions of the team" and "performance" related to the third, "Team Conflict" and "Performance" section four related to "time pressure" and "performance" related to the fifth. ANOVA analysis, three cases of conflict in a team, team incentive bonus, there is no significant difference in the time pressure factor of three teams. Only the team leader, team functions differ two factors.
|
author2 |
Shu Shun Liu |
author_facet |
Shu Shun Liu Cheng Yu Tsai 蔡承彧 |
author |
Cheng Yu Tsai 蔡承彧 |
spellingShingle |
Cheng Yu Tsai 蔡承彧 Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
author_sort |
Cheng Yu Tsai |
title |
Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
title_short |
Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
title_full |
Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
title_fullStr |
Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
title_full_unstemmed |
Empirical Research on Factors Affecting Team Performance - X High-Speed Rail Station as an Example |
title_sort |
empirical research on factors affecting team performance - x high-speed rail station as an example |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/bb92rb |
work_keys_str_mv |
AT chengyutsai empiricalresearchonfactorsaffectingteamperformancexhighspeedrailstationasanexample AT càichéngyù empiricalresearchonfactorsaffectingteamperformancexhighspeedrailstationasanexample AT chengyutsai yǐngxiǎngtuánduìjīxiàoyīnsùzhīshízhèngyánjiūyǐxgāotiězhànwèilì AT càichéngyù yǐngxiǎngtuánduìjīxiàoyīnsùzhīshízhèngyánjiūyǐxgāotiězhànwèilì |
_version_ |
1719132218470694912 |