Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example

碩士 === 逢甲大學 === 土木工程學系 === 105 === Cable is the main factor of constructing the principal part of the cable-stayed bridge, thus the force of cable appears to be useful in many aspects. However, the force of cable is not easily accessible, therefore, many formulas were derived to find its force. This...

Full description

Bibliographic Details
Main Authors: YOU,KAI-CHENG, 游凱丞
Other Authors: BU,JUN-PING
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/8yh98t
id ndltd-TW-105FCU00015025
record_format oai_dc
spelling ndltd-TW-105FCU000150252019-05-15T23:32:33Z http://ndltd.ncl.edu.tw/handle/8yh98t Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example 斜張橋繩索索力分析-以高屏溪斜張橋為例 YOU,KAI-CHENG 游凱丞 碩士 逢甲大學 土木工程學系 105 Cable is the main factor of constructing the principal part of the cable-stayed bridge, thus the force of cable appears to be useful in many aspects. However, the force of cable is not easily accessible, therefore, many formulas were derived to find its force. This essay has selected two methods to analyze, utilizing the data from the measurement of the cable-stayed bridge of Gaoping River. The first method is a traditional prestressing formula, including the formula of String theory, beat frequency and actuarial. The second method, please refer to reference [2]. This essay utilized the measurement data of cable-stayed bridge of Gaoping River, then compare them from the results. In the actuarial formula, the EI value is critical, however, in the engineering practice, the determination of EI value is not always accurate and the source of information is not easy to obtain. Therefore, a study (please refer to reference [2]) was found, emphasizing the tension of cable could be estimated in the limited condition with certain accuracy. Thus, the measurement results of Gaoping River were used to discuss the differences between each formula. Since in the analysis and measurement instance of the bridge cable tension, the replacement formula of double-modal frequency indicated that the EI value does not affect much of its formula, thus in the unknown situation, the certain accuracy could still be obtained. As the result, this essay attempted to modify the EI value of some formula, which used the EI value, to observe the influence of EI value to each formula. BU,JUN-PING 卜君平 2017 學位論文 ; thesis 69 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 土木工程學系 === 105 === Cable is the main factor of constructing the principal part of the cable-stayed bridge, thus the force of cable appears to be useful in many aspects. However, the force of cable is not easily accessible, therefore, many formulas were derived to find its force. This essay has selected two methods to analyze, utilizing the data from the measurement of the cable-stayed bridge of Gaoping River. The first method is a traditional prestressing formula, including the formula of String theory, beat frequency and actuarial. The second method, please refer to reference [2]. This essay utilized the measurement data of cable-stayed bridge of Gaoping River, then compare them from the results. In the actuarial formula, the EI value is critical, however, in the engineering practice, the determination of EI value is not always accurate and the source of information is not easy to obtain. Therefore, a study (please refer to reference [2]) was found, emphasizing the tension of cable could be estimated in the limited condition with certain accuracy. Thus, the measurement results of Gaoping River were used to discuss the differences between each formula. Since in the analysis and measurement instance of the bridge cable tension, the replacement formula of double-modal frequency indicated that the EI value does not affect much of its formula, thus in the unknown situation, the certain accuracy could still be obtained. As the result, this essay attempted to modify the EI value of some formula, which used the EI value, to observe the influence of EI value to each formula.
author2 BU,JUN-PING
author_facet BU,JUN-PING
YOU,KAI-CHENG
游凱丞
author YOU,KAI-CHENG
游凱丞
spellingShingle YOU,KAI-CHENG
游凱丞
Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
author_sort YOU,KAI-CHENG
title Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
title_short Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
title_full Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
title_fullStr Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
title_full_unstemmed Assessment of Prestressed Cables-Take Gaoping Cable-Stayed Bridge for Example
title_sort assessment of prestressed cables-take gaoping cable-stayed bridge for example
publishDate 2017
url http://ndltd.ncl.edu.tw/handle/8yh98t
work_keys_str_mv AT youkaicheng assessmentofprestressedcablestakegaopingcablestayedbridgeforexample
AT yóukǎichéng assessmentofprestressedcablestakegaopingcablestayedbridgeforexample
AT youkaicheng xiézhāngqiáoshéngsuǒsuǒlìfēnxīyǐgāopíngxīxiézhāngqiáowèilì
AT yóukǎichéng xiézhāngqiáoshéngsuǒsuǒlìfēnxīyǐgāopíngxīxiézhāngqiáowèilì
_version_ 1719150050511159296