Developing the Tukey’s Control Chart for Monitoring the Percentile of a Start-up Weibull Process
碩士 === 國立交通大學 === 工業工程與管理系所 === 105 === The conventional Shewhart’s control charts require that the process data follow a normal distribution and a large data set is needed for setting up the control limits. However, constructing the Shewhart’s control charts for a start-up process is difficult beca...
Main Authors: | Su, Chih-Hsuan, 蘇致萱 |
---|---|
Other Authors: | Tong, Lee-Ing |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/gmq987 |
Similar Items
-
Constructing the Tukey Control Chart for the Weibull Percentile of a Weibull Start-Up Process using Maximum Likelihood Estimation and Bootstrap Methods
by: Lin, Ching-Hung, et al.
Published: (2019) -
Applying BLIEs Method to Construct a Bootstrap Control Chart for the Percentile of Start-Up Weibull Processes
by: Weng, Erh-Cheng, et al.
Published: (2019) -
Applying MLE Method to Estimate the Low Percentile and Construct a Bootstrap Control Chart for the Low Percentile of a Start-up Weibull Process
by: Yu, Ya-Ting, et al.
Published: (2018) -
Constructing Weibull Percentile Control Chart Using BLIEs
by: Lee, Shao-Chen, et al.
Published: (2019) -
ROBUST ALTERNATIVES TO THE TUKEY'S CONTROL CHART FOR THE MONITORING OF THE STATISTICAL PROCESS MEAN
by: Moustafa Omar Ahmed AbuShawiesh, et al.
Published: (2019-09-01)