The Interaction Analysis of Construction Sequence and Ground Subsidence during Group Pipe Jacking
碩士 === 國立嘉義大學 === 土木與水資源工程學系研究所 === 105 === Sewer pipes, irrigation water supply, and electric power and telecommunication lines are critical infrastructure for urban life. These pipelines are buried underground by the cut and cover method that could result in noise and air pollution during construc...
Main Authors: | WEN SHAN WEI, 魏文山 |
---|---|
Other Authors: | 陳景文 |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/vtq3e3 |
Similar Items
-
Prediction of Surface Subsidence Caused by Rectangular Pipe Jacking Construction
by: Zhang Chao, et al.
Published: (2018-01-01) -
Pipe-jacked tunnelling : jacking loads and ground movements
by: Marshall, Mark Andrew
Published: (1998) -
Sensitivity analysis of ground settlement induced by pipe-jacking construction in soft soil stratum
by: Han Xianmin, et al.
Published: (2019-01-01) -
Prediction of Ground Deformation during Pipe-Jacking Considering Multiple Factors
by: Dong-Jie Ren, et al.
Published: (2018-06-01) -
A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
by: Zelin Niu, et al.
Published: (2020-01-01)