A Study of CCGT Unit Commitment Based on Equivalent Operation Hour
碩士 === 國立臺灣科技大學 === 電機工程系 === 105 === Unit commitment (UC) is a critical problem of system’s operation todetermine the statuses of units and priority order of each enerator. It is especially for thermal units to be scheduled during each time interval of the scheduled periods. The purpose of unit com...
Main Authors: | Ting-Jui Chang, 張庭瑞 |
---|---|
Other Authors: | Cheng-Chien Kuo |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/e286py |
Similar Items
-
Development of Information System for Unit Commitment Considering Equivalent Operating Hours of Combined-cycle Units
by: LIN, CHE-HSIEN, et al.
Published: (2017) -
Short-term Unit Commitment Considering Equivalent Operation Hour (EOH) of Combined-Cycle Units
by: WANG,JUN-JIE, et al.
Published: (2017) -
Increasing the reliability and manoeuvrability of the CCGT when operating in the variable part of the power consumption schedules by switching the CCGT steam turbine to the motor mode
by: Arakelyan Edik, et al.
Published: (2020-01-01) -
CCGT performance simulation and diagnostics for operations optimisation and risk management
by: Mucino, Marco
Published: (2008) -
CCGT performance simulation and diagnostics for operations optimisation and risk management
by: Mucino, Marco
Published: (2007)