Application of Business Analysis to Improve Road Curves – A Case Study on Provincial highway No.3 yun-mi Preparation road
碩士 === 逢甲大學 === 專案管理碩士在職學位學程 === 106 === This study intends to introduce Business Analysis techniques before the project begins. Tools such as needs assessment, documentation, and management requirements will be used to assist in identifying needs and propose proposals, and then to evaluate each sol...
Main Authors: | CHEN, HSIU HSIEN, 陳修賢 |
---|---|
Other Authors: | CHEN, CHANG-SHIAN |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/2376sv |
Similar Items
-
The application of compaction device for highway structural layer in the road construction of Yun-Mao Highway
by: He Boqian, et al.
Published: (2021-01-01) -
ViewShed Analysis Evaluation of the Scenic Road - A case study of 11th Provincial Highway
by: Li Yen Hsien, et al.
Published: (2005) -
Classification of provincial highways in Canada according to road use characteristics
by: Murthy, A. S. Narasimha
Published: (1982) -
The application of simultaneous paver liquid cement sprinkling system in the road construction of Yun-Mao Highway
by: He Boqian, et al.
Published: (2021-01-01) -
A Study on the Slope Failure Hazard along the Coastal Road─11th Provincial Highway
by: Chung-Hua Chen, et al.
Published: (2004)