Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area

碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 106 === Urban sewers or pipelines are constructed using diving shield tunnel , sometimes causing loss of life and property due to road surface subsidence caused by disasters. This paper is targeted at the case of road collapse accident caused by urban shield pr...

Full description

Bibliographic Details
Main Authors: CHEN,YING-SYUAN, 陳瑩璇
Other Authors: PAN, HUANG-HSING
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/86uuah
id ndltd-TW-106KUAS0653053
record_format oai_dc
spelling ndltd-TW-106KUAS06530532019-10-28T05:13:30Z http://ndltd.ncl.edu.tw/handle/86uuah Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area 都市潛盾洞道坍塌災害之緊急應變對策與防範 CHEN,YING-SYUAN 陳瑩璇 碩士 國立高雄應用科技大學 土木工程與防災科技研究所 106 Urban sewers or pipelines are constructed using diving shield tunnel , sometimes causing loss of life and property due to road surface subsidence caused by disasters. This paper is targeted at the case of road collapse accident caused by urban shield project, collects the causes of accidents, emergency measures and engineering rebuilding, and analyzes and discusses, and the case of the collapse of the road caused by the disaster caused by the cable tunnel construction of Taipower, discuss the disaster relief, disaster prevention and emergency response systems and preventive measures during the disaster of the shield tunnel, and analyze the prevention and rescue of tunnel collapse disasters through case studies. The results show that the cases are caused by groundwater damage caused by the collapse of the shield tunnel, In the initial stage, CLSM backfilling was not effective in emergency water treatment. It was necessary to use site grouting method, freezing method, wall method (adding water gate) and backfilling earthwork to remedy the problem, and accumulating sand packs and subsidence ground in the depression of the shield tunnel to carry out reinforcement grouting to stabilize the stratum; In personnel training and emergency notification, the ability to report emergency response should be strengthened, and establish a construction group communication platform, using the communication platform to immediately respond to strain response and disaster situation ; In the disaster area and personnel control, the safety of the disaster area should be determined first, personnel entering the disaster area are followed by security control personnel, emergency response team personnel, the public and the media to maintain control in the disaster area. In order to reduce the occurrence of disasters in the shield tunnel, the monitoring points should be increased in the sections within the scope of construction and the monitoring equipment should be set close to the location (depth) of the shields to grasp the changes in site behavior and play the monitoring and early warning function; I In the planning, design stage and construction stage, risk assessment must be carried out, hazard analysis should be carried out, countermeasures should be prepared, construction safety standards for high-risk operations should be established for possible situations, and construction risk management meetings should be held regularly to achieve management effectiveness and reduce disasters, Scope and scale to avoid unpredictable disasters caused by lack of construction experience. PAN, HUANG-HSING 潘煌鍟 2018 學位論文 ; thesis 136 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 106 === Urban sewers or pipelines are constructed using diving shield tunnel , sometimes causing loss of life and property due to road surface subsidence caused by disasters. This paper is targeted at the case of road collapse accident caused by urban shield project, collects the causes of accidents, emergency measures and engineering rebuilding, and analyzes and discusses, and the case of the collapse of the road caused by the disaster caused by the cable tunnel construction of Taipower, discuss the disaster relief, disaster prevention and emergency response systems and preventive measures during the disaster of the shield tunnel, and analyze the prevention and rescue of tunnel collapse disasters through case studies. The results show that the cases are caused by groundwater damage caused by the collapse of the shield tunnel, In the initial stage, CLSM backfilling was not effective in emergency water treatment. It was necessary to use site grouting method, freezing method, wall method (adding water gate) and backfilling earthwork to remedy the problem, and accumulating sand packs and subsidence ground in the depression of the shield tunnel to carry out reinforcement grouting to stabilize the stratum; In personnel training and emergency notification, the ability to report emergency response should be strengthened, and establish a construction group communication platform, using the communication platform to immediately respond to strain response and disaster situation ; In the disaster area and personnel control, the safety of the disaster area should be determined first, personnel entering the disaster area are followed by security control personnel, emergency response team personnel, the public and the media to maintain control in the disaster area. In order to reduce the occurrence of disasters in the shield tunnel, the monitoring points should be increased in the sections within the scope of construction and the monitoring equipment should be set close to the location (depth) of the shields to grasp the changes in site behavior and play the monitoring and early warning function; I In the planning, design stage and construction stage, risk assessment must be carried out, hazard analysis should be carried out, countermeasures should be prepared, construction safety standards for high-risk operations should be established for possible situations, and construction risk management meetings should be held regularly to achieve management effectiveness and reduce disasters, Scope and scale to avoid unpredictable disasters caused by lack of construction experience.
author2 PAN, HUANG-HSING
author_facet PAN, HUANG-HSING
CHEN,YING-SYUAN
陳瑩璇
author CHEN,YING-SYUAN
陳瑩璇
spellingShingle CHEN,YING-SYUAN
陳瑩璇
Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
author_sort CHEN,YING-SYUAN
title Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
title_short Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
title_full Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
title_fullStr Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
title_full_unstemmed Emergency Response Strategy and Prevention of Shield Tunnel Collapse in Urban Area
title_sort emergency response strategy and prevention of shield tunnel collapse in urban area
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/86uuah
work_keys_str_mv AT chenyingsyuan emergencyresponsestrategyandpreventionofshieldtunnelcollapseinurbanarea
AT chényíngxuán emergencyresponsestrategyandpreventionofshieldtunnelcollapseinurbanarea
AT chenyingsyuan dōushìqiándùndòngdàotāntāzāihàizhījǐnjíyīngbiànduìcèyǔfángfàn
AT chényíngxuán dōushìqiándùndòngdàotāntāzāihàizhījǐnjíyīngbiànduìcèyǔfángfàn
_version_ 1719279943894958080