碩士 === 國立中央大學 === 土木工程學系在職專班 === 106 === The South-Link Line Railway Electrification Project is the last mile of electrified railway network in Taiwan.It is a great challenge to complete the project within restricted limit of time on the condition of lack of alternative route and no sufficient space...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/g46xm7 |
id |
ndltd-TW-106NCU05015008 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106NCU050150082019-05-16T00:15:46Z http://ndltd.ncl.edu.tw/handle/g46xm7 none 軌道降碴作業機具調派最佳化之研究 Yi-Jiun Hou 侯宜君 碩士 國立中央大學 土木工程學系在職專班 106 The South-Link Line Railway Electrification Project is the last mile of electrified railway network in Taiwan.It is a great challenge to complete the project within restricted limit of time on the condition of lack of alternative route and no sufficient space for construction. It is no need to mention the difficulty of preventing disruption of regular railway opertion by the construction along the railway corridor, and the assigning effectively of people, machines, materials and vehicles. In this study, we establish optimization method of assignment for rail and highway vehicles by using integer programming. Solution is found by using LINGO 12.0 and Microsoft Excel. Simulation of the reduction of ballast construction is done by taking the South-Link Line Railway Electrification Project as example. Comparing with the emperical assignemnt, our method can solve the problem quickly and further reduce the required period of construction and the cost of rent of vehicles. We further study the effect of some sensitivity parameters in the example we concern. Our result can be the basis of suggetion of engineering assignemnt and vehicles renting. Shang-Yao Yan 顏上堯 2018 學位論文 ; thesis 67 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中央大學 === 土木工程學系在職專班 === 106 === The South-Link Line Railway Electrification Project is the last mile of electrified railway network in Taiwan.It is a great challenge to complete the project within restricted limit of time on the condition of lack of alternative route and no sufficient space for construction. It is no need to mention the difficulty of preventing disruption of regular railway opertion by the construction along the railway corridor, and the assigning effectively of people, machines, materials and vehicles.
In this study, we establish optimization method of assignment for rail and highway vehicles by using integer programming. Solution is found by using LINGO 12.0 and Microsoft Excel. Simulation of the reduction of ballast construction is done by taking the South-Link Line Railway Electrification Project as example. Comparing with the emperical assignemnt, our method can solve the problem quickly and further reduce the required period of construction and the cost of rent of vehicles. We further study the effect of some sensitivity parameters in the example we concern. Our result can be the basis of suggetion of engineering assignemnt and vehicles renting.
|
author2 |
Shang-Yao Yan |
author_facet |
Shang-Yao Yan Yi-Jiun Hou 侯宜君 |
author |
Yi-Jiun Hou 侯宜君 |
spellingShingle |
Yi-Jiun Hou 侯宜君 none |
author_sort |
Yi-Jiun Hou |
title |
none |
title_short |
none |
title_full |
none |
title_fullStr |
none |
title_full_unstemmed |
none |
title_sort |
none |
publishDate |
2018 |
url |
http://ndltd.ncl.edu.tw/handle/g46xm7 |
work_keys_str_mv |
AT yijiunhou none AT hóuyíjūn none AT yijiunhou guǐdàojiàngcházuòyèjījùdiàopàizuìjiāhuàzhīyánjiū AT hóuyíjūn guǐdàojiàngcházuòyèjījùdiàopàizuìjiāhuàzhīyánjiū |
_version_ |
1719163675155103744 |