Design and Implemention of an ePortfolio Management System The research of simple civil change and policy for New Taipei City

碩士 === 國立中山大學 === 高階公共政策碩士班 === 106 === New Taipei City Government to accelerate the promotion of the area as many as 620,000 housing age more than 30 years old house management are more reconstruction, to increase people''s living safety, quality of life and improve the fire disas...

Full description

Bibliographic Details
Main Authors: Tang-Chung Tan, 但唐忠
Other Authors: Daw-Yih Jang
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/c234mr
Description
Summary:碩士 === 國立中山大學 === 高階公共政策碩士班 === 106 === New Taipei City Government to accelerate the promotion of the area as many as 620,000 housing age more than 30 years old house management are more reconstruction, to increase people''s living safety, quality of life and improve the fire disaster relief environment, it is easy to promote a simple civil change, The original complex procedures are more consideration, while providing the appropriate volume of incentives, and actively involved in the transformation of those who actively provide a simple way to rebuild. The study found that, since the start in August 2013, there have been eight simple ways to apply for rebuilding. There have been a few commonalities observed in the past five successful cases, the first is residential, 1.5 times the volume The second is the new building with elevators and barrier-free equipment, in line with the elderly on the physical quality of housing needs; the third is no longer a distant reconstruction project for the urgent need to participate in the old house The real incentive for redeveloped seniors is not a higher volume award, nor a tax relief, but a simple redevelopment that has not had much waiting time. The fourth is that even if the joint venture is given a limited volume award Profit compression space, but the converted savings out of time to integrate costs, still profitable, but also by the success of the case to convince the other to be rebuilt communities, to further create long-lasting continuous profit; The builders did not win 20% of the maximum construction award cap.