Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
碩士 === 南臺科技大學 === 工業管理研究所 === 106 === This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate a...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/3qexfq |
id |
ndltd-TW-106STUT0041009 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106STUT00410092019-05-16T00:37:22Z http://ndltd.ncl.edu.tw/handle/3qexfq Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport 戰機無線電故障維修風險管理研究- 以空軍某機場為例 Shen, Shu-Wei 沈書緯 碩士 南臺科技大學 工業管理研究所 106 This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate and analyze fighter radio fault maintenance, including risk identification, risk evaluation, risk analysis, risk decision making, implementation of risk controls, and supervision and review. The results shows that there were 45 radio faults per year from 2013 to 2014 before promoting operational risk management in 2014, and the number of radio faults was decreased to 36 per year from 2015 to 2016 and 22 in 2017. Tseng, Wen-Hung 曾文宏 2018 學位論文 ; thesis 55 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 南臺科技大學 === 工業管理研究所 === 106 === This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate and analyze fighter radio fault maintenance, including risk identification, risk evaluation, risk analysis, risk decision making, implementation of risk controls, and supervision and review.
The results shows that there were 45 radio faults per year from 2013 to 2014 before promoting operational risk management in 2014, and the number of radio faults was decreased to 36 per year from 2015 to 2016 and 22 in 2017.
|
author2 |
Tseng, Wen-Hung |
author_facet |
Tseng, Wen-Hung Shen, Shu-Wei 沈書緯 |
author |
Shen, Shu-Wei 沈書緯 |
spellingShingle |
Shen, Shu-Wei 沈書緯 Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
author_sort |
Shen, Shu-Wei |
title |
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
title_short |
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
title_full |
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
title_fullStr |
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
title_full_unstemmed |
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport |
title_sort |
risk management of fighter radio fault maintenance-a case study of an air force airport |
publishDate |
2018 |
url |
http://ndltd.ncl.edu.tw/handle/3qexfq |
work_keys_str_mv |
AT shenshuwei riskmanagementoffighterradiofaultmaintenanceacasestudyofanairforceairport AT chénshūwěi riskmanagementoffighterradiofaultmaintenanceacasestudyofanairforceairport AT shenshuwei zhànjīwúxiàndiàngùzhàngwéixiūfēngxiǎnguǎnlǐyánjiūyǐkōngjūnmǒujīchǎngwèilì AT chénshūwěi zhànjīwúxiàndiàngùzhàngwéixiūfēngxiǎnguǎnlǐyánjiūyǐkōngjūnmǒujīchǎngwèilì |
_version_ |
1719168854580527104 |