Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport

碩士 === 南臺科技大學 === 工業管理研究所 === 106 === This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate a...

Full description

Bibliographic Details
Main Authors: Shen, Shu-Wei, 沈書緯
Other Authors: Tseng, Wen-Hung
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/3qexfq
id ndltd-TW-106STUT0041009
record_format oai_dc
spelling ndltd-TW-106STUT00410092019-05-16T00:37:22Z http://ndltd.ncl.edu.tw/handle/3qexfq Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport 戰機無線電故障維修風險管理研究- 以空軍某機場為例 Shen, Shu-Wei 沈書緯 碩士 南臺科技大學 工業管理研究所 106 This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate and analyze fighter radio fault maintenance, including risk identification, risk evaluation, risk analysis, risk decision making, implementation of risk controls, and supervision and review. The results shows that there were 45 radio faults per year from 2013 to 2014 before promoting operational risk management in 2014, and the number of radio faults was decreased to 36 per year from 2015 to 2016 and 22 in 2017. Tseng, Wen-Hung 曾文宏 2018 學位論文 ; thesis 55 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 南臺科技大學 === 工業管理研究所 === 106 === This research studies the implementation of operational risk management to fighter radio fault maintenance in an Air Force airport, and a continual cyclic six-step process with “Operational Risk Management Integration Tool” software package is used to evaluate and analyze fighter radio fault maintenance, including risk identification, risk evaluation, risk analysis, risk decision making, implementation of risk controls, and supervision and review. The results shows that there were 45 radio faults per year from 2013 to 2014 before promoting operational risk management in 2014, and the number of radio faults was decreased to 36 per year from 2015 to 2016 and 22 in 2017.
author2 Tseng, Wen-Hung
author_facet Tseng, Wen-Hung
Shen, Shu-Wei
沈書緯
author Shen, Shu-Wei
沈書緯
spellingShingle Shen, Shu-Wei
沈書緯
Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
author_sort Shen, Shu-Wei
title Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
title_short Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
title_full Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
title_fullStr Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
title_full_unstemmed Risk Management of Fighter Radio Fault Maintenance-A Case Study of an Air Force Airport
title_sort risk management of fighter radio fault maintenance-a case study of an air force airport
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/3qexfq
work_keys_str_mv AT shenshuwei riskmanagementoffighterradiofaultmaintenanceacasestudyofanairforceairport
AT chénshūwěi riskmanagementoffighterradiofaultmaintenanceacasestudyofanairforceairport
AT shenshuwei zhànjīwúxiàndiàngùzhàngwéixiūfēngxiǎnguǎnlǐyánjiūyǐkōngjūnmǒujīchǎngwèilì
AT chénshūwěi zhànjīwúxiàndiàngùzhàngwéixiūfēngxiǎnguǎnlǐyánjiūyǐkōngjūnmǒujīchǎngwèilì
_version_ 1719168854580527104