Logistics strategy optimization for offshore windfarms with power purchase agreement

Offshore wind is on the road to become commercially viable and competitive means for large-scale electricity production. This new industry is expected to occupy a major role in the energy transition. Operational costs and especially logistics cost for offshore maintenance are major factors and alrea...

Full description

Bibliographic Details
Main Author: Pottier, Aubin
Format: Others
Language:English
Published: KTH, Skolan för industriell teknik och management (ITM) 2021
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-300101
id ndltd-UPSALLA1-oai-DiVA.org-kth-300101
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-kth-3001012021-08-25T05:27:05ZLogistics strategy optimization for offshore windfarms with power purchase agreementengPottier, AubinKTH, Skolan för industriell teknik och management (ITM)2021Engineering and TechnologyTeknik och teknologierOffshore wind is on the road to become commercially viable and competitive means for large-scale electricity production. This new industry is expected to occupy a major role in the energy transition. Operational costs and especially logistics cost for offshore maintenance are major factors and already today represent important levers to reduce the electricity production costs. In this study, a methodology to design and optimize an offshore windfarm’s logistics strategy is developed. This methodology is based on a software able to simulate a large number of logistics strategies and their interactions with weather conditions. The main outputs of the simulation are the monthly availability of the turbines and the logistics costs. The case study illustrates that the critical windfarm’s size for which a logistics strategy based on a vessel remaining at sea for weeks (offshore-based) becomes more beneficial than a strategy based on vessels going back to the port every day (onshore-based strategy), is close to 170 turbines for conditions typical to geographical areas similar to the North Sea. The simulation results, combined with scientific literature review, identify the distance to shore, number of turbines and transfer capacity of vessels as key parameter of logistics strategy design. Vindkraft ute till havs är på väg att bli kommersiellt gångbart och konkurrenskraftigt medel för storskalig elproduktion. Denna nya industri förväntas inta en viktig roll i energiomställningen. Driftskostnader och särskilt logistikkostnader för reparationer och underhåll till havs är tunga faktorer och utgör redan idag viktiga spakar för att minska elproduktionskostnaderna. Denna studie utvecklar en metod för att designa och optimera logistikstrategi för underhåll av havsbaserad vindkraft. Metoden bygger på en programvara som kan simulera ett stort antal strategier och deras interaktion med väderförhållandena. De viktigaste resultaten av simuleringen är vindturbinernas månatliga tillgänglighet och logistikkostnader. Studien vilar på en fallstudie som illustrerar att den kritiska vindkraftsparkens storlek är närmare 170 turbiner då en logistikstrategi baserad på ett fartyg som stannar kvar i havet i flera veckor (offshore-baserat) blir mer fördelaktig än en strategi baserad på fartyg som går tillbaka till hamn varje dag (landbaserad strategi), för förhållanden som är typiska för geografiska områden som liknar Nordsjön. Simuleringsresultaten, kombinerat med vetenskaplig litteraturöversikt, identifierar avståndet till land, antalet turbiner och fartygens överföringskapacitet som nyckelparameter för logistikstrategidesign. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-300101TRITA-ITM-EX ; 2021:382application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language English
format Others
sources NDLTD
topic Engineering and Technology
Teknik och teknologier
spellingShingle Engineering and Technology
Teknik och teknologier
Pottier, Aubin
Logistics strategy optimization for offshore windfarms with power purchase agreement
description Offshore wind is on the road to become commercially viable and competitive means for large-scale electricity production. This new industry is expected to occupy a major role in the energy transition. Operational costs and especially logistics cost for offshore maintenance are major factors and already today represent important levers to reduce the electricity production costs. In this study, a methodology to design and optimize an offshore windfarm’s logistics strategy is developed. This methodology is based on a software able to simulate a large number of logistics strategies and their interactions with weather conditions. The main outputs of the simulation are the monthly availability of the turbines and the logistics costs. The case study illustrates that the critical windfarm’s size for which a logistics strategy based on a vessel remaining at sea for weeks (offshore-based) becomes more beneficial than a strategy based on vessels going back to the port every day (onshore-based strategy), is close to 170 turbines for conditions typical to geographical areas similar to the North Sea. The simulation results, combined with scientific literature review, identify the distance to shore, number of turbines and transfer capacity of vessels as key parameter of logistics strategy design. === Vindkraft ute till havs är på väg att bli kommersiellt gångbart och konkurrenskraftigt medel för storskalig elproduktion. Denna nya industri förväntas inta en viktig roll i energiomställningen. Driftskostnader och särskilt logistikkostnader för reparationer och underhåll till havs är tunga faktorer och utgör redan idag viktiga spakar för att minska elproduktionskostnaderna. Denna studie utvecklar en metod för att designa och optimera logistikstrategi för underhåll av havsbaserad vindkraft. Metoden bygger på en programvara som kan simulera ett stort antal strategier och deras interaktion med väderförhållandena. De viktigaste resultaten av simuleringen är vindturbinernas månatliga tillgänglighet och logistikkostnader. Studien vilar på en fallstudie som illustrerar att den kritiska vindkraftsparkens storlek är närmare 170 turbiner då en logistikstrategi baserad på ett fartyg som stannar kvar i havet i flera veckor (offshore-baserat) blir mer fördelaktig än en strategi baserad på fartyg som går tillbaka till hamn varje dag (landbaserad strategi), för förhållanden som är typiska för geografiska områden som liknar Nordsjön. Simuleringsresultaten, kombinerat med vetenskaplig litteraturöversikt, identifierar avståndet till land, antalet turbiner och fartygens överföringskapacitet som nyckelparameter för logistikstrategidesign.
author Pottier, Aubin
author_facet Pottier, Aubin
author_sort Pottier, Aubin
title Logistics strategy optimization for offshore windfarms with power purchase agreement
title_short Logistics strategy optimization for offshore windfarms with power purchase agreement
title_full Logistics strategy optimization for offshore windfarms with power purchase agreement
title_fullStr Logistics strategy optimization for offshore windfarms with power purchase agreement
title_full_unstemmed Logistics strategy optimization for offshore windfarms with power purchase agreement
title_sort logistics strategy optimization for offshore windfarms with power purchase agreement
publisher KTH, Skolan för industriell teknik och management (ITM)
publishDate 2021
url http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-300101
work_keys_str_mv AT pottieraubin logisticsstrategyoptimizationforoffshorewindfarmswithpowerpurchaseagreement
_version_ 1719472210377179136