Preliminary design and multi-criteria analysis of solutions for widening an existing concrete bridge : Case of the Bridge of Chaillot in Vierzon (France)
Europe experienced the destruction of numerous infrastructures during World War II, followed by a reflation and a strong economic growth during the next two decades allowing a more perennial and durable situation. A classical bridge lasting in general around 80 years, one should observe that these...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Bro- och stålbyggnad
2011
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-40479 |