Elektromagnetisk och mekanisk design av en 20MW turbogenerator

At the Division of Electricity at UppsalaUniversitythere are ongoing researches, including a research concerning turbo generators. Turbo generators produce a large share of electricity in the world; however they are costly mainly due to the fact that the cooling and ventilation that are needed to el...

Full description

Bibliographic Details
Main Author: Mahdi, Bawaqneh
Format: Others
Language:Swedish
Published: Uppsala universitet, Elektricitetslära 2011
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-157121
id ndltd-UPSALLA1-oai-DiVA.org-uu-157121
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-uu-1571212013-01-08T13:50:24ZElektromagnetisk och mekanisk design av en 20MW turbogeneratorsweDesign av en 20MW turbogeneratorMahdi, BawaqnehUppsala universitet, Elektricitetslära2011Electric power engineeringElkraftteknikAt the Division of Electricity at UppsalaUniversitythere are ongoing researches, including a research concerning turbo generators. Turbo generators produce a large share of electricity in the world; however they are costly mainly due to the fact that the cooling and ventilation that are needed to eliminate the excess heat from the generators are expensive. Turbo generators work with high efficiency and in this project, the main task is to simulate a generator while taking into account that the generator must be designed against self-oscillation, centrifugal force, exhaustion and heat. The turbo generator must be simulated without being too expensive and complicated. In this project, the dimensions of the turbo generator depend on the efficiency of it, and where the losses are in the generator. Furthermore, the optimum values need to be chosen with the help of the ACE simulation program. The report begins with an introduction describing the project followed by a task description that is dealing with the project. The project aims to obtain an optimal design that is simple to construct, with good durability and preferably at a reasonable cost. The function of the turbo generator has been studied, as well as the FEM calculations that affect the durability and structural strength of the generator. In this report you can further read more in detail about the methods used and how solutions were reached to solve the problems that were encountered. The conclusion of this project was that the turbo-generator which were simulated is a turbo-generator that has a lower load angle compared with Björn Bolund turbo-generator. It also has a high efficiency which makes it more stable than Björn Bolund and the high efficiency makes it save energy and cooling equipment. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-157121application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language Swedish
format Others
sources NDLTD
topic Electric power engineering
Elkraftteknik
spellingShingle Electric power engineering
Elkraftteknik
Mahdi, Bawaqneh
Elektromagnetisk och mekanisk design av en 20MW turbogenerator
description At the Division of Electricity at UppsalaUniversitythere are ongoing researches, including a research concerning turbo generators. Turbo generators produce a large share of electricity in the world; however they are costly mainly due to the fact that the cooling and ventilation that are needed to eliminate the excess heat from the generators are expensive. Turbo generators work with high efficiency and in this project, the main task is to simulate a generator while taking into account that the generator must be designed against self-oscillation, centrifugal force, exhaustion and heat. The turbo generator must be simulated without being too expensive and complicated. In this project, the dimensions of the turbo generator depend on the efficiency of it, and where the losses are in the generator. Furthermore, the optimum values need to be chosen with the help of the ACE simulation program. The report begins with an introduction describing the project followed by a task description that is dealing with the project. The project aims to obtain an optimal design that is simple to construct, with good durability and preferably at a reasonable cost. The function of the turbo generator has been studied, as well as the FEM calculations that affect the durability and structural strength of the generator. In this report you can further read more in detail about the methods used and how solutions were reached to solve the problems that were encountered. The conclusion of this project was that the turbo-generator which were simulated is a turbo-generator that has a lower load angle compared with Björn Bolund turbo-generator. It also has a high efficiency which makes it more stable than Björn Bolund and the high efficiency makes it save energy and cooling equipment.
author Mahdi, Bawaqneh
author_facet Mahdi, Bawaqneh
author_sort Mahdi, Bawaqneh
title Elektromagnetisk och mekanisk design av en 20MW turbogenerator
title_short Elektromagnetisk och mekanisk design av en 20MW turbogenerator
title_full Elektromagnetisk och mekanisk design av en 20MW turbogenerator
title_fullStr Elektromagnetisk och mekanisk design av en 20MW turbogenerator
title_full_unstemmed Elektromagnetisk och mekanisk design av en 20MW turbogenerator
title_sort elektromagnetisk och mekanisk design av en 20mw turbogenerator
publisher Uppsala universitet, Elektricitetslära
publishDate 2011
url http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-157121
work_keys_str_mv AT mahdibawaqneh elektromagnetiskochmekaniskdesignaven20mwturbogenerator
AT mahdibawaqneh designaven20mwturbogenerator
_version_ 1716530531518119936