Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company
A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it’s possible to produce the publications that Villafabriken demands from the designengineer’s work, and examine...
Main Author: | Fält, Pernilla |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
Växjö universitet, Institutionen för teknik och design
2009
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-5675 |
Similar Items
-
Från CAD till BIM inom småhusindustrin
by: Hansen, Fredrik, et al.
Published: (2015) -
Anpassning av BIM-metodik för bättre mängdavtagning
by: Persäter, Jens, et al.
Published: (2014) -
Effektivisering av förvaltningsskedet med hjälp av flerdimensionella BIM-modeller : En studie om BIM 360 Ops
by: Issa, Mona, et al.
Published: (2019) -
HÅLLBART BYGGANDEMED HJÄLP AV BIM : Effektiva energianalyser och LCC
by: Mika, Jonas, et al.
Published: (2015) -
Digitalt byggande
by: Molin, Olof
Published: (2010)