Fatigue Assessment for Failed Bridge Deck Closure Pour
After 17 years in service, a 3 ft by 3 ft closure pour section of an Interstate 81 (I-81) bridge deck failed by punching through near Marion, Virginia. Visual inspection noted that there was considerable corrosion on some of the reinforcing bars in the vicinity of the construction joint, while other...
Main Author: | Rivera, Elias Alexander |
---|---|
Other Authors: | Civil Engineering |
Format: | Others |
Published: |
Virginia Tech
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/33242 http://scholar.lib.vt.edu/theses/available/etd-05252012-135136/ |
Similar Items
-
Fatigue Evaluation of Rib-to-Deck Joint in Orthotropic Steel Bridge Decks
by: Li, Ming
Published: (2015) -
Polymer Concrete for Bridge Deck Closure Joints in Accelerated Bridge Construction
by: Islam Mantawy, et al.
Published: (2019-06-01) -
Corrosion Assessment for Failed Bridge Deck Closure Pour
by: Abbas, Ebrahim K.
Published: (2014) -
Research on Fatigue Strength for Weld Structure Details of Deck with U-rib and Diaphragm in Orthotropic Steel Bridge Deck
by: Yixin Chen, et al.
Published: (2019-04-01) -
Fatigue Reliability Assessment for Orthotropic Steel Bridge Decks Considering Load Sequence Effects
by: Jun-Hong Xu, et al.
Published: (2021-05-01)