A methodology to solve single-model, stochastic assembly line balancing problem and its extensions

A methodology for the solution of single-model, stochastic assembly line balancing problem is developed for the objective of minimizing the total labor cost (dictated by the number of stations on the line) and expected incompletion cost arising from tasks not completed within the prespecified cycle...

Full description

Bibliographic Details
Main Author: Erel, Erdal
Other Authors: Industrial Engineering and Operations Research
Format: Others
Language:en_US
Published: Virginia Polytechnic Institute and State University 2018
Subjects:
Online Access:http://hdl.handle.net/10919/82633
id ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-82633
record_format oai_dc
spelling ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-826332020-09-29T05:36:38Z A methodology to solve single-model, stochastic assembly line balancing problem and its extensions Erel, Erdal Industrial Engineering and Operations Research LD5655.V856 1987.E734 Assembly-line balancing Stochastic processes A methodology for the solution of single-model, stochastic assembly line balancing problem is developed for the objective of minimizing the total labor cost (dictated by the number of stations on the line) and expected incompletion cost arising from tasks not completed within the prespecified cycle time. The proposed procedure is an approximation procedure that divides the problem into subproblems. For each subproblem, an approximate solution is obtained using the dynamic programming procedure developed for the problem. This procedure is incorporated with a special bounding strategy to overcome the rapidly increasing storage and computational requirements as the size of the problem increases. These approximate solutions are further improved by a branch-and-bound type of procedure called the improvement procedure. This procedure uses approximate costs, instead of lower bounds, to fathom the nodes of the enumeration tree constructed; thus, it is not, in the true sense of the word, the branch-and-bound technique. Consequently, the procedure is not guaranteed to result in the optimal solution; however, it is shown to generate solutions within (1 + ε) of the optimal solution. The improvement procedure either improves the approximate solutions obtained using the dynamic programming procedure or determines that they are quite close to the optimal ones. The improved solutions of the subproblems are then appended to each other to produce the solution of the original problem. Some dominance properties that contribute to the effectiveness of the improvement procedure and help in reducing the size of the enumeration tree are developed. Some sequencing and scheduling problems related to the node evaluation scheme of the improvement procedure are also investigated. A single-machine sequencing procedure is developed for the objective of minimizing the expected incompletion cost with tasks having a common due date and stochastic processing times. This procedure is extended to construct a schedule on M parallel machines. In these procedures, in-completion costs of the tasks are independent of their expected performance times; it can be interpreted as relaxing the precedence relations among the tasks. Solution procedures are also developed for the above sequencing and scheduling problems for the case in which the incompletion costs of the tasks are proportional to their expected performance times. Computational results and analyses made indicate that these procedures result in almost optimal solutions. Ph. D. 2018-03-26T19:29:09Z 2018-03-26T19:29:09Z 1987 Dissertation Text http://hdl.handle.net/10919/82633 en_US OCLC# 16837532 In Copyright http://rightsstatements.org/vocab/InC/1.0/ xv, 233 leaves application/pdf application/pdf Virginia Polytechnic Institute and State University
collection NDLTD
language en_US
format Others
sources NDLTD
topic LD5655.V856 1987.E734
Assembly-line balancing
Stochastic processes
spellingShingle LD5655.V856 1987.E734
Assembly-line balancing
Stochastic processes
Erel, Erdal
A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
description A methodology for the solution of single-model, stochastic assembly line balancing problem is developed for the objective of minimizing the total labor cost (dictated by the number of stations on the line) and expected incompletion cost arising from tasks not completed within the prespecified cycle time. The proposed procedure is an approximation procedure that divides the problem into subproblems. For each subproblem, an approximate solution is obtained using the dynamic programming procedure developed for the problem. This procedure is incorporated with a special bounding strategy to overcome the rapidly increasing storage and computational requirements as the size of the problem increases. These approximate solutions are further improved by a branch-and-bound type of procedure called the improvement procedure. This procedure uses approximate costs, instead of lower bounds, to fathom the nodes of the enumeration tree constructed; thus, it is not, in the true sense of the word, the branch-and-bound technique. Consequently, the procedure is not guaranteed to result in the optimal solution; however, it is shown to generate solutions within (1 + ε) of the optimal solution. The improvement procedure either improves the approximate solutions obtained using the dynamic programming procedure or determines that they are quite close to the optimal ones. The improved solutions of the subproblems are then appended to each other to produce the solution of the original problem. Some dominance properties that contribute to the effectiveness of the improvement procedure and help in reducing the size of the enumeration tree are developed. Some sequencing and scheduling problems related to the node evaluation scheme of the improvement procedure are also investigated. A single-machine sequencing procedure is developed for the objective of minimizing the expected incompletion cost with tasks having a common due date and stochastic processing times. This procedure is extended to construct a schedule on M parallel machines. In these procedures, in-completion costs of the tasks are independent of their expected performance times; it can be interpreted as relaxing the precedence relations among the tasks. Solution procedures are also developed for the above sequencing and scheduling problems for the case in which the incompletion costs of the tasks are proportional to their expected performance times. Computational results and analyses made indicate that these procedures result in almost optimal solutions. === Ph. D.
author2 Industrial Engineering and Operations Research
author_facet Industrial Engineering and Operations Research
Erel, Erdal
author Erel, Erdal
author_sort Erel, Erdal
title A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
title_short A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
title_full A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
title_fullStr A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
title_full_unstemmed A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
title_sort methodology to solve single-model, stochastic assembly line balancing problem and its extensions
publisher Virginia Polytechnic Institute and State University
publishDate 2018
url http://hdl.handle.net/10919/82633
work_keys_str_mv AT erelerdal amethodologytosolvesinglemodelstochasticassemblylinebalancingproblemanditsextensions
AT erelerdal methodologytosolvesinglemodelstochasticassemblylinebalancingproblemanditsextensions
_version_ 1719344346641203200