Menesi, W. (2010). Construction Scheduling using Critical Path Analysis with Separate Time Segments.
Chicago Style (17th ed.) CitationMenesi, Wail. Construction Scheduling Using Critical Path Analysis with Separate Time Segments. 2010.
MLA (8th ed.) CitationMenesi, Wail. Construction Scheduling Using Critical Path Analysis with Separate Time Segments. 2010.
Warning: These citations may not always be 100% accurate.