DEVELOPMENT AND TESTING OF DATA STRUCTURES FOR THE CPM/MRP METHODOLOGY.
A major purpose of this dissertation is to design and develop data structures for the Critical Path Method-Material Requirements Planning (CPM/MRP) methodology. The data structures developed consider the trade-off between processing time required to perform the required operations on data structures...
Main Author: | Ardalan, Alireza |
---|---|
Other Authors: | Aquilano, Nicholas J. |
Language: | en |
Published: |
The University of Arizona.
1983
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/186869 |
Similar Items
-
MRP explosion for the Commodore computer
by: May, Karen Marie
Published: (2011) -
Transient behavior of stochastic networks :
application to production planning with load-dependent lead times
by: Riaño, Germán
Published: (2008) -
The calendar heap: A new implementation of the calendar queue
by: Ramsey, Terry, 1946-
Published: (1989) -
Transforming data flow diagrams to software structure using the Yourdon-Constantine methodology
by: Antonucci, Franco
Published: (2011) -
MICROCOMPUTER BASED TRUCK DISPATCHING SYSTEM - OVERALL SYSTEM MANAGEMENT
by: Rakshit, Ananda
Published: (1984)