Water Supply System Management Design and Optimization under Uncertainty

Increasing population, diminishing supplies and variable climatic conditions can cause difficulties in meeting water demands. When this long range water supply plan is developed to cope with future water demand changes, accuracy and reliability are the two most important factors. To develop an accur...

Full description

Bibliographic Details
Main Author: Chung, Gunhui
Other Authors: Lansey, Kevin E.
Language:EN
Published: The University of Arizona. 2007
Subjects:
Online Access:http://hdl.handle.net/10150/195506
Description
Summary:Increasing population, diminishing supplies and variable climatic conditions can cause difficulties in meeting water demands. When this long range water supply plan is developed to cope with future water demand changes, accuracy and reliability are the two most important factors. To develop an accurate model, the water supply system has become more complicated and comprehensive structures. Future uncertainty also has been considered to improve system reliability as well as economic feasibility.In this study, a general large-scale water supply system that is comprised of modular components was developed in a dynamic simulation environment. Several possible scenarios were simulated in a realistic hypothetical system. In addition to water balances and quality analyses, construction and operation of system components costs were estimated for each scenario. One set of results demonstrates that construction of small-cluster decentralized wastewater treatment systems could be more economical than a centralized plant when communities are spatially scattered or located in steep areas.The Shuffled Frog Leaping Algorithm (SFLA), then, is used to minimize the total system cost of the general water supply system. Decisions are comprised of sizing decisions - pipe diameter, pump design capacity and head, canal capacity, and water/wastewater treatment capabilities - and flow allocations over the water supply network. An explicit representation of energy consumption cost for the operation is incorporated into the system in the optimization process of overall system cost. Although the study water supply systems included highly nonlinear terms in the objective function and constraints, a stochastic search algorithm was applied successfully to find optimal solutions that satisfied all the constraints for the study networks.Finally, a robust optimization approach was introduced into the design process of a water supply system as a framework to consider uncertainties of the correlated future data. The approach allows for the control of the degree of conservatism which is a crucial factor for the system reliabilities and economical feasibilities. The system stability is guaranteed under the most uncertain condition and it was found that the water supply system with uncertainty can be a useful tool to assist decision makers to develop future water supply schemes.