Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines

Bibliography: leaves 155-160. === The ultimate purpose of this thesis is to compare and evaluate. South African poletop designs for 11kV and 22kV rural distribution lines. However, a frame of reference is first established from the literature and from construction practice before the analytical stag...

Full description

Bibliographic Details
Main Author: Scott, R A
Other Authors: Dingley, Charles
Format: Dissertation
Language:English
Published: University of Cape Town 2014
Subjects:
Online Access:http://hdl.handle.net/11427/8353
id ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-8353
record_format oai_dc
spelling ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-83532020-12-10T05:11:07Z Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines Scott, R A Dingley, Charles Electrical and Electronic Engineering Bibliography: leaves 155-160. The ultimate purpose of this thesis is to compare and evaluate. South African poletop designs for 11kV and 22kV rural distribution lines. However, a frame of reference is first established from the literature and from construction practice before the analytical stage is tackled. In 1989, when the work for this thesis was started, it was quite apparent that there existed a proliferation of configuration designs for rural overhead lines at 11 kV and 22kV in South Africa. The electricity supply industry did not use a universal configuration. Eskom supplied over 97 of South Africa's electricity in 1990 (Eskom, 1990). It was also operating 160 280km of lines at 22kV and below in that year and was largely responsible for this situation. Local supply authorities or distributors S!JCh as municipalities either bought components from Eskom or used an Eskom design, or developed their own designs internally or via consultants. In any event, the designs they used are not considered to be a significant portion of the total. Historically, Eskom developed on a strongly regionalised basis, the separate Undertakings joining up (electrically) to form the national grid in 1973. Prior to 1985 there were six Regions distributing the electricity generated by the power stations. Each Region developed its own designs, independently or based on designs imported from Britain. 2014-10-11T12:06:17Z 2014-10-11T12:06:17Z 1992 Master Thesis Masters MSc http://hdl.handle.net/11427/8353 eng application/pdf University of Cape Town Faculty of Engineering and the Built Environment Department of Electrical Engineering
collection NDLTD
language English
format Dissertation
sources NDLTD
topic Electrical and Electronic Engineering
spellingShingle Electrical and Electronic Engineering
Scott, R A
Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
description Bibliography: leaves 155-160. === The ultimate purpose of this thesis is to compare and evaluate. South African poletop designs for 11kV and 22kV rural distribution lines. However, a frame of reference is first established from the literature and from construction practice before the analytical stage is tackled. In 1989, when the work for this thesis was started, it was quite apparent that there existed a proliferation of configuration designs for rural overhead lines at 11 kV and 22kV in South Africa. The electricity supply industry did not use a universal configuration. Eskom supplied over 97 of South Africa's electricity in 1990 (Eskom, 1990). It was also operating 160 280km of lines at 22kV and below in that year and was largely responsible for this situation. Local supply authorities or distributors S!JCh as municipalities either bought components from Eskom or used an Eskom design, or developed their own designs internally or via consultants. In any event, the designs they used are not considered to be a significant portion of the total. Historically, Eskom developed on a strongly regionalised basis, the separate Undertakings joining up (electrically) to form the national grid in 1973. Prior to 1985 there were six Regions distributing the electricity generated by the power stations. Each Region developed its own designs, independently or based on designs imported from Britain.
author2 Dingley, Charles
author_facet Dingley, Charles
Scott, R A
author Scott, R A
author_sort Scott, R A
title Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
title_short Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
title_full Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
title_fullStr Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
title_full_unstemmed Comparison and evaluation of South African poletop designs for 11kV and 22kV rural distribution lines
title_sort comparison and evaluation of south african poletop designs for 11kv and 22kv rural distribution lines
publisher University of Cape Town
publishDate 2014
url http://hdl.handle.net/11427/8353
work_keys_str_mv AT scottra comparisonandevaluationofsouthafricanpoletopdesignsfor11kvand22kvruraldistributionlines
_version_ 1719369488212688896