The safe and feasible positioning, design and construction of the MERENSKY BOXCUT at the booysendal complex
A research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, in partial fulfilment of the requirements for the degree of Master of Science in Engineering, 2018 === The mining industry is not as favourable investment destinati...
Main Author: | Nothnagel, Stefanus Jacobus |
---|---|
Format: | Others |
Language: | en |
Published: |
2019
|
Online Access: | https://hdl.handle.net/10539/26760 |
Similar Items
-
Implementation of a GHH roof bolter machine at Merensky shaft (Booysendal Platinum Mine): a case study
by: Kekana, Wonderboy Orchard
Published: (2018) -
Element mapping the Merensky Reef of the Bushveld Complex
by: William Smith, et al.
Published: (2021-05-01) -
The Merensky Unit, Lonplats' Mines, western Bushveld Complex
by: Shelembe, Refilwe Pamela
Published: (2008) -
The design and behaviour of crush pillars on the Merensky reef
by: Du Plessis, Michael
Published: (2016) -
Rock behaviour of the Bushveld Merensky Reef and the design of crush pillars
by: Watson, Bryan Philip
Published: (2011)