Thermodynamic Modeling of HVAC Plant Cooling Equipment for Quantification of Energy Savings Through Continuous Commissioning Measures
The Continuous Commissioning (CC) process is applied to existing buildings in order to reduce energy consumption by optimizing HVAC system operation and improving occupant comfort. The CC process consists of implementing energy saving measures for the air-side and plant-side of HVAC systems. Curre...
Main Author: | Rivera, Steven |
---|---|
Other Authors: | Claridge, David E. |
Format: | Others |
Language: | en_US |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/1969.1/ETD-TAMU-2011-12-10417 |
Similar Items
-
Thermodynamic modeling and optimization of a screw compressor chiller and cooling tower system
by: Graves, Rhett David
Published: (2004) -
Study on simplified energy‐efficient control methods of HVAC cooling water system from the global online optimization perspective
by: Tianyi Zhao, et al.
Published: (2021-04-01) -
Optimum Design and Operation of an HVAC Cooling Tower for Energy and Water Conservation
by: Clemente García Cutillas, et al.
Published: (2017-03-01) -
Optimizing multi-chiller dispatch in HVAC system using equilibrium optimization algorithm
by: Fukang Sun, et al.
Published: (2021-11-01) -
Chilled Water Storage Feasibility with District Cooling Chiller in Tropical Environment
by: Hilal Al Quabeh, et al.
Published: (2020-03-01)