Application of Blockchain Technology in Production Scheduling and Management of Human Resources Competencies

Today, enterprises are multitasking, with branches set up all over the world. Virtual enterprises are created to make better use of existing resources, improve the quality of manufactured products and agilely respond to customer requirements. In order to fully meet the requirements of enterprises, a...

Full description

Bibliographic Details
Main Authors: Balon, B. (Author), Kalinowski, K. (Author), Paprocka, I. (Author)
Format: Article
Language:English
Published: MDPI 2022
Subjects:
Online Access:View Fulltext in Publisher
Description
Summary:Today, enterprises are multitasking, with branches set up all over the world. Virtual enterprises are created to make better use of existing resources, improve the quality of manufactured products and agilely respond to customer requirements. In order to fully meet the requirements of enterprises, a decentralized structure of data registration and transmission and authentication of network users is needed. The information collected via the Internet of Things and flowing based on the properties of the Blockchain (BC) network facilitates enterprise resource planning and enables the integration of internal processes, especially when planning, changing the current or introducing new production. The aim of this paper is to present the concept of using a common data register in BC technology, which enables a number of applications related to the automation of the process of selecting human resources for production tasks. The paper presents an analysis of the problem related to the integration of production scheduling and human resource management with blockchain technology. Also presented is a literature analysis on scheduling, blockchain technology and data storage in the blockchain network. The analysis presents how the blockchain network works and how exactly it fits into production engineering with its advantages and disadvantages. An employee evaluation method based on the resource work history and determination of its current value within individual competencies is presented. The integration of production scheduling and human resource management with the use of BC technology is simulated. The most important advantage is faster and more effective planning thanks to the elimination of all intermediary channels in the flow of production transactions. Production tasks are balanced with production capacity in entities belonging to the virtual enterprise in parallel. For future research, different online planning algorithms will be developed and compared to achieve consortium members’ consensus on production and human resources planning. © 2022 by the authors. Licensee MDPI, Basel, Switzerland.
ISBN:14248220 (ISSN)
DOI:10.3390/s22082844