Comparison of operational performance before and after improvement: Case study at Pengkalan Weld, Pulau Pinang
Delay Study is to evaluate the quality of traffic movement along a route and to determine the level of service at a study area. This study can be used to compare and evaluate operational conditions before and after roadway or when intersection improvements have been made. The objective of this study...
Main Authors: | Basri M.H.H (Author), Goh L.D (Author), Hamid M.S.A (Author), Hashim, M.Z (Author), Hassan S.H (Author), Ng K.S (Author), Roslam, M.S (Author), Shah, S.M.R (Author), Tey, L.S (Author), Woo Y.P (Author), Zainuddin, N.I (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
American Institute of Physics Inc.
2018
|
Online Access: | View Fulltext in Publisher View in Scopus |
Similar Items
-
Comparison of Operational Performance Before and After Improvement: Case Study at Pengkalan Weld, Pulau Pinang
by: Hashim, MZ, et al.
Published: (2018) -
The comparison of construction waste produced by conventional method against IBS: A case study in Pulau Pinang
by: Basri M.H.H, et al.
Published: (2018) -
Traffic impact analysis of existing road at Jalan Berapit (state route P131) Bukit Mertajam, Pulau Pinang based on road safety audit (stage 5) guidelines
by: Albar, A., et al.
Published: (2018) -
The practice of construction waste management in Pulau Pinang
by: Abdullah M.H.R.O, et al.
Published: (2016) -
Analysis of rework causes in infrastructure projects in pulau pinang
by: Dollah, Z., et al.
Published: (2021)