Integrating value management into sustainable construction projects in Hong Kong

Purpose: Integrating sustainability into the value management (VM) process can provide a strategic platform for promoting and incorporating sustainable design and development during the lifespans of construction projects. The purpose of this paper is to investigate the strengths, weaknesses, opportu...

Full description

Bibliographic Details
Main Authors: Javed, A.A (Author), Lam, T.I (Author), Shen, G.Q (Author), Sun, M. (Author), Yu, A.T.W (Author)
Format: Article
Language:English
Published: Emerald Group Holdings Ltd. 2018
Subjects:
Online Access:View Fulltext in Publisher
LEADER 03526nam a2200373Ia 4500
001 10.1108-ECAM-03-2017-0049
008 220706s2018 CNT 000 0 und d
020 |a 09699988 (ISSN) 
245 1 0 |a Integrating value management into sustainable construction projects in Hong Kong 
260 0 |b Emerald Group Holdings Ltd.  |c 2018 
856 |z View Fulltext in Publisher  |u https://doi.org/10.1108/ECAM-03-2017-0049 
520 3 |a Purpose: Integrating sustainability into the value management (VM) process can provide a strategic platform for promoting and incorporating sustainable design and development during the lifespans of construction projects. The purpose of this paper is to investigate the strengths, weaknesses, opportunities and threats (SWOT) for integrating sustainability into the VM process in Hong Kong. Design/methodology/approach: Following an extensive literature review, 45 attributes were identified and grouped into strength, weakness, opportunity and threat elements. A questionnaire survey based on these groupings was supported by semi-structured interviews with public sector clients, value managers and VM facilitators. They shared their experience and views on how to integrate sustainability into the VM exercises. Findings: The triangulated results of the survey and interviews are presented in this paper. The ranking of the SWOT analysis results indicate that VM does provide opportunities for multidisciplinary professionals and stakeholders to focus on issues relating to society and the environment, which is considered a main strength. The major weakness of integration is the lack of well-trained staff and low levels of VM participant expertise in relation to the sustainable construction issue. Research limitations/implications: Current practices generally neglect integration of sustainability into the VM process due to cost and time constraints. There are ample strengths and opportunities recommended by this study for integrating sustainability into the VM process which are beneficial for the clients and contractors for achieving value for money and meeting sustainability targets. Practical implications: There are immense opportunities for integrating sustainability into the VM process, including encouragement of the reduction, reuse and recycling of construction and demolition waste. However, threats presented by integration include the additional time and costs required for achieving sustainability targets. Originality/value: Findings and recommendations provided in this paper should be helpful to decision makers including clients and VM facilitators for the successful integration of the sustainability concept into the VM process. © 2018, Emerald Publishing Limited. 
650 0 4 |a Construction 
650 0 4 |a Construction and demolition waste 
650 0 4 |a Decision making 
650 0 4 |a Demolition 
650 0 4 |a Design/methodology/approach 
650 0 4 |a Integrate sustainability 
650 0 4 |a Integrated practice 
650 0 4 |a Integration 
650 0 4 |a Opportunities and threat (SWOT) 
650 0 4 |a Project management 
650 0 4 |a Questionnaire survey 
650 0 4 |a Questionnaire surveys 
650 0 4 |a Semi structured interviews 
650 0 4 |a Surveys 
650 0 4 |a Sustainable development 
650 0 4 |a Value management 
700 1 |a Javed, A.A.  |e author 
700 1 |a Lam, T.I.  |e author 
700 1 |a Shen, G.Q.  |e author 
700 1 |a Sun, M.  |e author 
700 1 |a Yu, A.T.W.  |e author 
773 |t Engineering, Construction and Architectural Management