Chechuha, O., Kharchenko, A., Shuliak, I., Tsybulskyi, V., & Zavorotnii, S. (2022). BUILDING A MODEL FOR MANAGING THE COST AND DURATION OF MOTOR ROAD PROJECTS. Technology Center. https://doi.org/10.15587/1729-4061.2022.256213
Chicago Style (17th ed.) CitationChechuha, O., A. Kharchenko, I. Shuliak, V. Tsybulskyi, and S. Zavorotnii. BUILDING A MODEL FOR MANAGING THE COST AND DURATION OF MOTOR ROAD PROJECTS. Technology Center, 2022. https://dx.doi.org/10.15587/1729-4061.2022.256213.
MLA (8th ed.) CitationChechuha, O., et al. BUILDING A MODEL FOR MANAGING THE COST AND DURATION OF MOTOR ROAD PROJECTS. Technology Center, 2022.
Warning: These citations may not always be 100% accurate.