Challenging Tendering‐Phase Factors in Public Construction Projects—A Delphi Study in Saudi Arabia

Public construction projects in Saudi Arabia are fraught with several challenges threatening open and fair competition, which consequently negatively influence the decision of contractors to participate in bidding. Nevertheless, the construction sector has witnessed rapid reforms since 2016, which h...

Full description

Bibliographic Details
Main Authors: Alahmadi, N. (Author), Alghaseb, M. (Author)
Format: Article
Language:English
Published: MDPI 2022
Subjects:
Online Access:View Fulltext in Publisher
LEADER 02451nam a2200205Ia 4500
001 10.3390-buildings12070924
008 220718s2022 CNT 000 0 und d
020 |a 20755309 (ISSN) 
245 1 0 |a Challenging Tendering‐Phase Factors in Public Construction Projects—A Delphi Study in Saudi Arabia 
260 0 |b MDPI  |c 2022 
856 |z View Fulltext in Publisher  |u https://doi.org/10.3390/buildings12070924 
520 3 |a Public construction projects in Saudi Arabia are fraught with several challenges threatening open and fair competition, which consequently negatively influence the decision of contractors to participate in bidding. Nevertheless, the construction sector has witnessed rapid reforms since 2016, which have resulted in the issuing of new legislation and regulations as well as the creation of governing bodies. Hence, the concept of open and fair competition plays a significant role in the governance of these challenges in the upstream process of construction tendering. Therefore, this paper explores challenges that are hindering contractors’ participation in the tendering phase of public construction projects in light of these new legislations and authorities. Twelve challenging factors were identified from a structured literature review of previous relevant empirical studies available in online search engines since the 1980s. Those factors were measured through Delphi survey questionnaires, which provided respondents with the option of adding new challenging factors. Thus, twenty factors were identified. A descriptive method was used to determine and prioritize these challenging factors. The survey findings indicate that the most influential hindering factors are (1) awarding contracts based on the lowest bidder, (2) inadequate or incomplete specifications, (3) poor contract documents, and (4) poor cost‐estimating practices. These findings are vital in exposing the lack of relationships between the construction industry, regulators, and stakeholders for robust partnerships, thereby helping to ensure the fair participation of contractors, which boosts open and fair competition concepts for public construction projects. © 2022 by the authors. Licensee MDPI, Basel, Switzerland. 
650 0 4 |a bidding 
650 0 4 |a fair competition 
650 0 4 |a public construction 
650 0 4 |a Saudi Arabia 
650 0 4 |a tendering 
700 1 |a Alahmadi, N.  |e author 
700 1 |a Alghaseb, M.  |e author 
773 |t Buildings