Study on berth planning problem in a container seaport: using an integrated programming approach
This paper provides an integrated solution for two common processes in a container seaport: namely, the Berth Allocation Process (BAP) and the Quay Crane Scheduling Process (QCSP). These are formulated through a Bi-Level Programming (BLP) approach, which is used to characterize the highly interrelat...
Main Authors: | Song, Liying (Author), Cherrett, T.J (Author), Guan, W. (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
2012-02.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Some considerations on berth productivity referred on dry bulk cargoes in a multipurpose seaport
by: Deda Đelović, et al.
Published: (2017-01-01) -
Forecast Models of Container Throughput and Berths Planning of Container Port
by: Sheng-Chieh Wu, et al.
Published: (2006) -
Simulation-Based Operational Evaluation of a Single-Berth Multipurpose Seaport with Wharf Space Restriction
by: Wei Xie, et al.
Published: (2021-08-01) -
Planning Container Drayage Operations at Congested Seaports
by: Namboothiri, Rajeev
Published: (2006) -
A Study of Berth Planning Optimization Problems
by: Yu-Chun Teng, et al.
Published: (2013)