Analysis of abnormal expansion of pipe system and optimization of structural stress in 350MW unit

A 350MW power plant main steam and reheat hot steam pipe subsidence occurred in part of the pipe section, through field inspection, calculation and checking analysis, combined with pipeline support and hanger adjustment, load testing and elevation measurement and other means, the settlement of the p...

Full description

Bibliographic Details
Main Authors: Liu Xin, Zhang Yanming, Liu Qun, Sun Xu, Wang Yu, Zhao Liye
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/37/e3sconf_icemee2021_02073.pdf