Stability considerations of permanent magnet quadrupoles for CESR phase-III upgrade

The Cornell electron storage ring (CESR) phase-III upgrade plan includes very strong permanent magnet quadrupoles in front of the cryostat for the superconducting quadrupoles and physically as close as possible to the interaction point. Together with the superconducting quadrupoles, they provide tig...

Full description

Bibliographic Details
Main Authors: W. Lou, D. Hartill, D. Rice, D. Rubin, J. Welch
Format: Article
Language:English
Published: American Physical Society 1998-06-01
Series:Physical Review Special Topics. Accelerators and Beams
Online Access:http://doi.org/10.1103/PhysRevSTAB.1.022401