Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan

We consider the bounded parallel-batch scheduling with two models of deterioration, in which the processing time of the first model is pj=aj+αt and of the second model is pj=a+αjt. The objective is to minimize the makespan. We present O(n log n) time algorithms for the single-machine problems, respe...

Full description

Bibliographic Details
Main Author: Cuixia Miao
Format: Article
Language:English
Published: Hindawi Limited 2014-01-01
Series:Abstract and Applied Analysis
Online Access:http://dx.doi.org/10.1155/2014/495187