Lower Bounds and Semi On-line Multiprocessor Scheduling
We are given a set of identical machines and a sequence of jobs from which we know the sum of the job weights in advance. The jobs have to be assigned on-line to one of the machines and the objective is to minimize the makespan. An algorithm with performance ratio 1.6 and a lower bound of 1.5 is pre...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Institute of Mathematics and Computer Science of the Academy of Sciences of Moldova
2003-10-01
|
Series: | Computer Science Journal of Moldova |
Online Access: | http://www.math.md/files/csjm/v11-n2/v11-n2-(pp209-228).pdf |