A two-stage stochastic rule-based model to determine pre-assembly buffer content
Abstract This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University
2018-01-01
|
Series: | Journal of Industrial Engineering International |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s40092-017-0252-4 |