A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop
This paper considers an assembly scheduling problem which minimizes the total weighted tardiness. The system consists of multiple manufacturing machines in the first stage and an assembly machine in the second stage. A job is composed of multiple components, each component is manufactured on a dedic...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/9723439 |