Application of TOPSIS method in prioritization of highway bridges for seismic retrofitting
The process of bridges seismic retrofitting in the highway network is extremely costly and time consuming. In addition, the constraint on resources prevents the retrofitting of all the bridges at the same time. Besides, the bridges must be prioritized with simultaneous consideration of multiple cri...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2014-12-01
|
Series: | Engineering Structures and Technologies |
Subjects: | |
Online Access: | https://journals.vgtu.lt/index.php/EST/article/view/3206 |