An Integrated Method for Interval Multi-Objective Planning of a Water Resource System in the Eastern Part of Handan
In this study, an integrated solving method is proposed for interval multi-objective planning. The proposed method is based on fuzzy linear programming and an interactive two-step method. It cannot only provide objectively optimal values for multiple objectives at the same time, but also effectively...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2017-07-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/9/7/528 |