Analysis of the water‐filling process for crude oil pipelines with a large drop in height

Abstract To explore the problem of the slack flow and waterhead having a huge impact on the low point of a pipeline during the water‐filling process of a large‐drop pipeline, the crossing section of the Nujiang China‐Myanmar crude oil pipeline (for which the maximum height difference is 1480 m) is t...

Full description

Bibliographic Details
Main Authors: Enbin Liu, Bingyan Guo, Mingjun Wang, Xi Ma, Yong Peng
Format: Article
Language:English
Published: Wiley 2020-06-01
Series:Energy Science & Engineering
Subjects:
Online Access:https://doi.org/10.1002/ese3.650