Analysis of the water‐filling process for crude oil pipelines with a large drop in height
Abstract To explore the problem of the slack flow and waterhead having a huge impact on the low point of a pipeline during the water‐filling process of a large‐drop pipeline, the crossing section of the Nujiang China‐Myanmar crude oil pipeline (for which the maximum height difference is 1480 m) is t...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-06-01
|
Series: | Energy Science & Engineering |
Subjects: | |
Online Access: | https://doi.org/10.1002/ese3.650 |