Two-Layer Optimization Scheduling Model of Integrated Electricity and Natural Gas Energy System Considering the Feasibility of Gas-Fired Units’ Reserve
The reserve scheduling is important for integrated energy systems to cope with sudden disturbances such as fluctuations of renewable energy. The existing reserve scheduling approaches for integrated energy systems need iterations of calculation to guarantee the feasibility of the gas-fired units...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9016190/ |