Application of a Double-Sided Chance-Constrained Integer Linear Program for Optimization of the Incremental Value of Ecosystem Services in Jilin Province, China

The Interconnected River System Network Project (IRSNP) is a significant water supply engineering project, which is capable of effectively utilizing flood resources to generate ecological value, by connecting 198 lakes and ponds in western Jilin, northeast China. In this article, an optimization res...

Full description

Bibliographic Details
Main Authors: Baofeng Cai, Xianen Wang, Yu Li
Format: Article
Language:English
Published: MDPI AG 2017-08-01
Series:Water
Subjects:
Online Access:https://www.mdpi.com/2073-4441/9/8/629