An Optimal Schedule for Urban Road Network Repair Based on the Greedy Algorithm.

The schedule of urban road network recovery caused by rainstorms, snow, and other bad weather conditions, traffic incidents, and other daily events is essential. However, limited studies have been conducted to investigate this problem. We fill this research gap by proposing an optimal schedule for u...

Full description

Bibliographic Details
Main Authors: Guangquan Lu, Ying Xiong, Chuan Ding, Yunpeng Wang
Format: Article
Language:English
Published: Public Library of Science (PLoS) 2016-01-01
Series:PLoS ONE
Online Access:http://europepmc.org/articles/PMC5074568?pdf=render