Penentuan Interval Waktu Perawatan Komponen Kritis pada Mesin Turbin di PT PLN (Persero) Sektor Pembangkit Ombilin
Electrical energy requirements in Indonesia annually increase in line with economic growth and an increase in population. So, PT PLN (Persero) have to be able to fulfill the public demands for electrical energy. One of the power generation existed is Steam PowerGeneration. The condition of power gen...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Andalas
2016-04-01
|
Series: | Jurnal Optimasi Sistem Industri |
Subjects: | |
Online Access: | http://josi.ft.unand.ac.id/index.php/josi/article/view/10 |