Evaluation of behaviors of earth and rockfill dams during construction and initial impounding using instrumentation data and numerical modeling
In this study, the behavior of Gavoshan dam was evaluated during construction and the first impounding. A two-dimensional (2D) numerical analysis was conducted based on a finite difference method on the largest cross-section of the dam using the results of instrument measurements and back analysis....
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2017-08-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674775516300877 |