Integrated Optimization of the Location–Inventory Problem of Maintenance Component Distribution for High-Speed Railway Operations

Sustainable distribution network design for the maintenance components of electric multiple units (EMUs) is critical to reduce the problem of unreasonable resource allocation and capital occupation of high-speed railway (HSR) operations. Motivated by the above analysis, this study investigates the i...

Full description

Bibliographic Details
Main Authors: Dezhi Zhang, Shuxin Yang, Shuangyan Li, Jiajun Fan, Bin Ji
Format: Article
Language:English
Published: MDPI AG 2020-07-01
Series:Sustainability
Subjects:
Online Access:https://www.mdpi.com/2071-1050/12/13/5447