Design Flood Estimation: Exploring the Potentials and Limitations of Two Alternative Approaches

The design of flood defence structures requires the estimation of flood water levels corresponding to a given probability of exceedance, or return period. In river flood management, this estimation is often done by statistically analysing the frequency of flood discharge peaks. This typically requir...