Design Flood Estimation: Exploring the Potentials and Limitations of Two Alternative Approaches
The design of flood defence structures requires the estimation of flood water levels corresponding to a given probability of exceedance, or return period. In river flood management, this estimation is often done by statistically analysing the frequency of flood discharge peaks. This typically requir...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-04-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/11/4/729 |