Rockburst Prediction From the Perspective of Energy Release: A Case Study of a Diversion Tunnel at Jinping II Hydropower Station

As a man-made engineering hazard, it is widely accepted that the rockbursts are the result of energy release. Previous studies have examined the unloading of in-situ stress resulting from deep tunnel excavation as a quasi-static process but the transient stress variation during excavation has receiv...

Full description

Bibliographic Details
Main Authors: Yong Fan, Xianze Cui, Zhendong Leng, Junwei Zheng, Feng Wang, Xiaole Xu
Format: Article
Language:English
Published: Frontiers Media S.A. 2021-09-01
Series:Frontiers in Earth Science
Subjects:
Online Access:https://www.frontiersin.org/articles/10.3389/feart.2021.711706/full