A Biobjective and Trilevel Programming Model for Hub Location Problem in Design of a Resilient Power Projection Network

Hubs disruptions are taken into account in design of a resilient power projection network. The problem is tackled from a multiple criteria decision-making (MCDM) perspective. Not only the network cost in normal state is considered, but also the cost in the worst-case situation is taken into account....

Full description

Bibliographic Details
Main Authors: Hai-Ling Bi, Kai Kang, Xu-Tao Zhang
Format: Article
Language:English
Published: Hindawi Limited 2016-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2016/5329196