A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective...

Full description

Bibliographic Details
Main Authors: Abolfazl Kazemi, Abdolhossein Sedighi
Format: Article
Language:English
Published: Islamic Azad University, Qazvin Branch 2013-09-01
Series:Journal of Optimization in Industrial Engineering
Subjects:
Online Access:http://www.qjie.ir/article_137_66232200736f343a352a980af9cb8521.pdf