Analysis of different height systems along the Sava river
The paper presents a project of renovating a levelling line from Hydroelectric Power Plant Medvode to Hydroelectric Power Plant Vrhovo. The levelling line is situated along the Sava River. A new height of benchmark was needed as a vertical reference system for the project building up a new HPP betw...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2012-08-01
|
Series: | Geodesy and Cartography |
Subjects: | |
Online Access: | https://btp.vgtu.lt/index.php/GAC/article/view/10866 |